City of London Freemens school

City of London Freemen’s School Swimming Pool Successfully Handed Over!

City of London Freemen’s School Swimming Pool Successfully Handed Over!

November 15th, 2017 | News

Works and commissioning have been completed at the City of London Freemen’s School’s new £30m swimming pool and the building has been successfully handed over. This project consisted of the complete refurbishment of the Ashtead 18th century mansion house and the construction of an eye catching 25m six-lane swimming pool and adjoining events space. The […]

Read the rest of this post

[social4i size="small" align="align-left"]
Construction Progressing Well at Freemen’s School Swimming Pool, London

Construction Progressing Well at Freemen’s School Swimming Pool, London

February 24th, 2017 | News

Works are going ahead as scheduled at the City of London Freemen’s School Swimming Pool with the pool basin taking shape and the building’s steel structures being fitted. Our works at the London Grammar school are part of a refurbishment scheme on the School’s Swimming Pool, a project which includes the construction of a 25m […]

Read the rest of this post

[social4i size="small" align="align-left"]
Initial Works Started at Freemen’s School Swimming Pool

Initial Works Started at Freemen’s School Swimming Pool

November 14th, 2016 | News

Initial construction works have begun at the City of London Freemen’s School Swimming pool with the first fix pool pipe works now underway. These works form part of the refurbishment of the Freemen’s School Swimming Pool, a project which includes the construction of a 25m swimming pool, a learner pool and an ‘events space’. Michael […]

Read the rest of this post

[social4i size="small" align="align-left"]
Michael Nugent Granted M&E Contract for £30m Freemen’s School Refurbishment Project

Michael Nugent Granted M&E Contract for £30m Freemen’s School Refurbishment Project

September 21st, 2016 | News

The City of London Freemen’s School is proceeding with phase 2 of its £30million “master plan” refurbishment project with Michael Nugent Ltd chosen to provide the M&E.    Phase 2 of the plan by the London school includes the complete refurbishment of the Ashtead 18th century mansion house and the construction of an eye catching […]

Read the rest of this post

[social4i size="small" align="align-left"]