Archives

ECOS Centre

ECOS Centre

March 27th, 2017 |

The ECOS Centre Ballymena was originally built as an educational tool for renewable energy and a model of sustainability, however public interest in the project faded over the years and the building became neglected. Works were required to rejuvenate the project, bringing the structure in line with current building regulations as well as breathing life […]

Read the rest of this post

[social4i size="small" align="align-left"]
Almac Group Laboratory & Offices

Almac Group Laboratory & Offices

March 21st, 2017 |

Pharmaceutical giant Almac Group are expanding globally and as part of this global expansion, have invested in building a new laboratory and office facility at their headquarters in Craigavon, Co. Armagh. This welcomed investment will see 170 employees transferred to the new building. Michael Nugent Ltd provided a full mechanical and electrical services installation for […]

Read the rest of this post

[social4i size="small" align="align-left"]
Catalyst Inc. Concourse III

Catalyst Inc. Concourse III

December 12th, 2016 |

Catalyst Inc. (previously known as NI Science Park) offers administrative facilities to knowledge-based enterprises. Spanning across three buildings and two glazed hinges – and at 165,000 squared foot in size – these three impressive buildings contain numerous offices and laboratories, as well as catering and conference facilities. Concourse III is the latest of these three […]

Read the rest of this post

[social4i size="small" align="align-left"]
NI Science Park, Derry

NI Science Park, Derry

January 29th, 2015 |

The Innovation Centre in Derry was established to anchor the work of the NI Science Park across the north and west of the Province.  At 50,000 square foot in size, the facility provides space for over 30 tenants from software, telecoms, digital media, bioscience and television production businesses. The Data Centre and flexible work areas […]

Read the rest of this post

[social4i size="small" align="align-left"]
NI Science Park, Building 1

NI Science Park, Building 1

January 29th, 2015 |

The Northern Ireland Science Park offers administrative facilities to knowledge-based enterprises. Spanning across three buildings and two glazed hinges – and at 210,000 squared foot in size – Building 1 of the Science Park holds numerous offices, laboratories, catering and conference facilities. The unique design of the building means all pumping and ventilation pipes are exposed […]

Read the rest of this post

[social4i size="small" align="align-left"]
QUB Ashby Tower Phase 1

QUB Ashby Tower Phase 1

January 29th, 2015 |

Housing Queen’s University’s School of Engineering, Ashby Tower contains multiple lecture theatres; teaching areas; research areas; IT suites; offices and meeting rooms. The building’s design was focused on creating a multidisciplinary facility of teaching, prototyping, research and individual study. The refurbishment of Ashby Tower was particularly complex as the building remained fully operational throughout. This […]

Read the rest of this post

[social4i size="small" align="align-left"]
CTIR University of Dundee

CTIR University of Dundee

January 29th, 2015 |

The Centre for Translational and Interdisciplinary Research is an exciting, innovative development at the University of Dundee. With the purpose of providing research space for drug development, Mathematical Biology, Biophysics, Bioinformatics, data analysis and software development, the building houses over 140 research staff in multiple laboratories. The CTIR also encourages the amalgamation of science and […]

Read the rest of this post

[social4i size="small" align="align-left"]
NI Science Park, Building 2

NI Science Park, Building 2

January 27th, 2015 |

Spanning across three buildings and two glass-hinges at 210,000 squared foot in size, the Northern Ireland Science Park offers the best administrative facilities for knowledge-based businesses. The park contains two Concourse buildings, the second of which holds numerous offices, laboratories and conference rooms. Michael Nugent supplied all mechanical services to Building 2 during its construction. Much […]

Read the rest of this post

[social4i size="small" align="align-left"]
Sligo Institute of Technology

Sligo Institute of Technology

March 19th, 2014 |

Located in the North West of Ireland, Sligo Institute of Technology is a regional leader in education, innovation and economic development. The institute therefore aims to provide students with the best resources available, including a multi-purpose sports centre and facilities for medical research. Working across a number of the institute’s campuses, Michael Nugent Ltd fitted […]

Read the rest of this post

[social4i size="small" align="align-left"]
Vascular Research Unit

Vascular Research Unit

February 22nd, 2014 |

As part of Queen’s University, the Vascular Research Unit at the Royal Victoria Hospital in Belfast is comprised of numerous laboratories, animal holding rooms, offices, study spaces and kitchen facilities. The project – which was in association with Queen’s University Development and Research of Vision and Vascular Science – was carried out over four phases. Our […]

Read the rest of this post

[social4i size="small" align="align-left"]